Our Customer

Genis Steel offers full-service structural steel to leading industrial and residential builders

With over 40 years of experience, Genis manages all aspects of steel fabrication from on-site measuring, in-house drafting and full-site installation. Genis Steel had seen their retail cost of power triple since 2017, and as a high user were at risk of further increases.

Genis steel energy case study

How we helped

With over 20,000 square meters, Genis Steel partnered with Choice Solar to provide a large-scale solar solution to cover their base load demand, approximately 50% of their daytime power needs. The 300kW solution, alongside Power Factor Correction, sees Genis saving in excess of $100,000 per year.

Genis steel energy case study 1

Benefits

20,000 sqm

A large scale solar solution assisted in the energy requirements of their 20,000sqm location

50%

Genis Steel is expected to see a 50% reduction in daytime power requirements from the grid

$100,000

The combined efforts of the Power Factor Correction and installed Solar system sees Genis Steel save in excess of $100,000 per year


Can you access energy savings too? Gain a no-obligation assessment of your energy usage to identify ways you can save.

Related Energy Services

Take back control of your energy

Speak to one of our Choice Energy Assessors for a free energy evaluation today!

Choice Rep Interactingwith Customer_Hi Res
Get Started

Take power back and reduce your energy costs. Provide us with a snapshot of your business and energy needs and we'll be in touch.